Attractive Prefabricated Metal Supermarket Steel Structure Building Manufacturer Supermarket Shopping Mall

Product Description

Steel Structure Building
Prefabricated Metal Supermarket
Attractive prefabricated metal supermarket steel structure building manufacturer construction shopping mall
VR Showcase

Product Display

Items Specifications
Main structure PEB Welded H-shaped steel or hot rolled steel, Q355 or Q235
Anti-rust protection Hot dip galvanized or anti-rust painting
Purlins and girts Cold rolled C or Z steel, Q355 or Q235
Roof and wall Single layer steel sheet or sandwich panel
Gutter Heavy duty galvanized steel
Down pipe PVC
Door Sliding door or roller shutter
Windows PVC or aluminum alloy
Other components available upon request. Please provide the details for custom design.

Basic Building Parameters We Take into Consideration

Building Width

No matter what primary framing system is used, the building width is defined as the distance from outside of eave strut of one sidewall. Building width does not include the width of Lean-To buildings or roof extensions.

Building Length

The longitudinal length of the building measured from out to out of end wall steel lines.

Building Height

Building height is the eave height which usually is the distance from the bottom of the main frame column base plate to the top outer point of the eave strut. When columns are recessed or elevated from finished floor, eave height is the distance from finished floor level to top of eave strut.

Roof Slope (x/10)

This is the angle of the roof with respect to the horizontal. The most common roof slopes are 0.5/10 and 1/10. Any practical roof slope is possible.

End Bay Length

The distance from outside of the outer flange of end wall columns to center line of the first interior frame column.

Interior Bay Length

The distance between the center lines of two adjacent interior main frame columns. The most common bay lengths are 6m, 7.5m and 9m.

Design Loads Note

Design for snow loads, earthquake loads, collateral loads, crane loads or any other loading condition, if required, must be specified at the time of request for quotation.

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load:

  • Project site location
  • Overall dimension (length * width * eave height in meters)
  • Mezzanine or not? How many kgs of load per square meter on mezzanine?
  • Single-layer steel sheet wall or sandwich panel wall
  • Snow load if applicable
  • Wind speed/load
  • Interior column allowed or not
  • Overhead crane needed or not, capacity?
  • Any other particular requirements?

Building Purpose

We will recommend the best design for the purpose of the building:

A. Warehouse/Storage
B. Factory
C. Agriculture Barn
D. Retail Store
E. Repair/Mechanic Shop
F. Office Space
G. Medical Warehouse
H. Animal Farm
Design Drawing

Design Strength & Certifications

Certifications
Widely used prefabricated steel structure gas station petrol station design storage buildings warehouse

Manufacturing and Projects

Factory Facility
Steel Structure Production

Global Exhibitions & Visits

Mongolia Exhibition
Mongolia Exhibition
Dominica Exhibition
Dominica Exhibition
Philippine Exhibition
Philippine Exhibition
Customer Visit
Customer Visit

Project Cases

Project Case Study

Advantages of Steel Structure Buildings

  1. The components of the steel structure have small section, light weight, easy to transport and install, suitable for large span, high height, heavy bearing structure.
  2. Suitable for withstanding impact and dynamic load, with good seismic performance. The internal structure of steel is uniform with high reliability.
  3. Factory mechanized production of steel structure components finished products of high precision, high production efficiency, site assembly speed, short construction period.

Our prefabricated steel structure buildings are pre-cut, pre-drilled, and ready for quick and efficient assembly. Steel buildings work for virtually any building application: Agricultural/ Barns/ Aircraft Hangars/ Welding Shops/ Commercial center/ Garages/ Storage/ Suburban Buildings/ Warehouses/ Workshops/ school/ wedding hall/ dormitory etc.

Steel Structure Construction Site
Finished Steel Structure Warehouse

Packaging & Logistics

Packaging and Shipping
China Fabricated prefab steel structure workshop metal building structures hangar prefabricated construction

Frequently Asked Questions

Q1: Are you a manufacture factory or a trading company?

A: We are a manufacture factory. And you are welcomed to visit us at any time for inspection. The quality control flow and sales team will show you our professionalism. Also, you will get the best and most competitive price after visiting us.

Q2: What is the quality assurance you provided and how do you control quality?

A: Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.

Q3: Is your price competitive compared with other companies?

A: Our business objectives are to give the best price with the same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

Q4: Can you send engineers or a whole team to install my project?

A: Yes, we will send you the detailed installation drawing and video for free. We can provide the service of installation, supervision, and training by extra. We can send our professional technical team to supervise installation on site overseas.

Q5: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) etc., we can design complex industrial buildings like office mansions, super markets, auto dealer shops, and shopping malls.

Q6: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Related Products