Modern and Rapid Construction of Modular Houses with Bathrooms Casas Containerized Residential Solar Powered Containers

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Info.

Model NO. expandable Container House
Fast Installation Standard Installation
Feature Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance
Material Container
Lead Time 30 to 45 Days
Color Customized
Size Customized
Service 3D Photo and CAD Design
Shipping Sea Shipping Worldwide
Minimum Order Quantity 1 Unit
Life Span 10 to 15 Years
After-Sales Service Online Technical Guidance
Warranty 12 Months
Usage Scenarios Dormitory, Warehouse, Villa, Office
Certification CE, ISO
Customized Customized
Transport Package Bubbled Plastic Wrap
Specification 2480x2200x5900
HS Code 9406900090
Production Capacity 30 Per Day

Packaging & Delivery

Package Size 5800.00cm * 2450.00cm * 2560.00cm
Package Gross Weight 3000.000kg

Product Description

Title goes here.

Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.

Frequently Asked Questions

Q1: How much manpower and time does it take to install the container?

It takes approximately 2 hours and 4 workers to fully install 1 unit.

Q2: What tools and equipment do I need to prepare for the installation?

You will need to prepare a crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, and spirit level.

Q3: What is the fastest lead time for an order?

This depends on the quantity. For regular sizes, the lead time is generally 7-15 days after receiving the deposit.

Q4: How are the container houses insulated against temperature extremes?

The wall panels are constructed from 50mm rock wool sandwich panels. These can be upgraded to 75mm or 100mm thickness to provide better insulation for extreme cold or hot weather conditions. The floor can also be covered with insulation upon request.

Q5: Is a foundation required before putting up the container house?

If the ground does not subside, there is basically no need to lay concrete foundations. Guidance and suggestions will be offered based on geological conditions. Complete foundation drawings and video installation instructions are provided.

Q6: How is the product quality guaranteed before shipment?

Every step of production is checked by quality inspectors using vernier calipers to measure material thickness. The paint surface integrity is checked before packing, and wearing parts along with spare materials are shipped together. Photos and videos are also taken prior to delivery for confirmation.

Related Products