In the year of 2009, our company started as a pioneer of exporting Pre-Engineered Building Steel Structure (PEBS) to overseas market. It began commercial operations in 2010 with a fabricating and roll forming plant. After years of expansion, till today, it has multiple branch plants of PEB fabrication and roll forming.
Our team is a growing provider of one stop solutions including: design, fabrication, erection and after-sales service of Pre-Engineered Building Steel Structure (PEBS). With experienced designer, senior engineer, detailing technician, production manager, strict quality inspector, well-trained welder in main plant and branch plants, a capacity of 50,000 Metric Tons of PEBS is being produced annually. Numerous high-quality projects have been completed both home and abroad.
Our service is also recommended by designers and consultants as trustworthy partner in fabrication for steel structure contractors.
| Base | Cement and steel foundation bolt |
| Main frame | H beam |
| Material | Q235B, Q345B or others as buyers' requests |
| Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 |
| Bracing | X-type or other type bracing made from angle, round pipe |
| Bolt | Plain bolt and High-strength bolt |
| Roof & wall | Sandwich panel or color plate |
| Door | Sliding or rolling door |
| Window | Aluminium alloy window |
| Surface | Two times of Anti-rust Painting or Hot Dip Galvanized |
| Sheet | 0.5mm or 0.6mm galvanized sheet |
| Accessories | Semi-transparent skylight belts, Ventilators, down pipe, galvanized gutter, etc |
Description: This project is industrial factory and warehouse for a food company producing dry banana. The building features two storey office facility.
The client choose us after visited our local projects. When they came to our projects, we were installing a 3 storey steel structure building for commercial and residential building, more than 2000sqm. No need more words, seeing is believing!
Description: This project includes island airport terminal building, staff dormitory, fire station, Island Resort, Staff Office & Club Center.
Difficulty: Replace British standard materials with Chinese standards, and convert accordingly and output all construction drawings.
The third-party QC of this project stayed in our factory to track the entire manufacturing process. After hard work, 100% of our projects have passed the customer's inspection. Customers are very happy to cooperate with us. Now we are the VIP supplier in the customer list, and we are also responsible for the procurement of other engineering materials.